flag

Comrades Marathon 2025 | Course | Altimetry

Comrades Marathon 2025: route, altitude, uphill/downhill statistics, gpx file

Note: "Comrades Marathon 2025" is NOT organized by goandrace.com

Comrades Marathon 2025 course map. Length: 89 km.

89 km (55.3 mi) course map of the event "Comrades Marathon 2025" in Pietermaritzburg (Sunday, June 8, 2025). Explore the route!

Do you want to fly over the path with a Google Earth 3D video? Click on the following link: Comrades Marathon 2025, fly over the path (3D video).

GPS track - .gpx file download

Download the gps race path by clicking here. You can send the .gpx file to your Garmin watch or other compatible device and follow the path. For instructions on how to upload the GPX file onto your Garmin watch click here.

 .gpx file download

NB: it is possible that the length calculated from the gpx file is greater than that of the race, with an error typically of 1-2%.

Click the following link to visit the Comrades Marathon 2025 event page.

Comrades Marathon 2025: route altimetric information



Comrades Marathon 2025: GNR-GAP index (v 1.0, experimental, see more)

Comrades Marathon 2025: interactive route

You can set the km (or mile) markers and you can select different types of layers (Satellite or Openstreetmap).

Comrades Marathon 2025: altimetry graph

Comrades Marathon 2025: slope graph

Comrades Marathon 2025: percentage distribution of slope

Comrades Marathon 2025: km by km elevation analysis

Lap Start Elev. End Elev. Elev. Diff. Avg Slope Min Elev. Max Elev. Total Ascent Total Descent
KM 0-1 653 632 -21 -2.1% 633 653 0 21
KM 1-2 632 651 +19 +1.9% 627 651 24 5
KM 2-3 651 661 +9 +0.9% 652 661 9 0
KM 3-4 661 668 +7 +0.7% 661 675 14 7
KM 4-5 668 694 +26 +2.6% 664 694 30 4
KM 5-6 694 694 0 0% 694 701 7 7
KM 6-7 694 712 +19 +1.9% 688 712 24 5
KM 7-8 712 727 +15 +1.5% 712 726 19 4
KM 8-9 727 750 +23 +2.3% 728 755 28 5
KM 9-10 750 678 -72 -7.2% 679 749 0 72
KM 10-11 678 650 -28 -2.8% 639 677 10 39
KM 11-12 650 696 +46 +4.6% 650 696 46 0
KM 12-13 696 654 -41 -4.1% 655 696 0 41
KM 13-14 654 645 -9 -0.9% 638 653 6 15
KM 14-15 645 689 +44 +4.4% 645 688 44 0
KM 15-16 689 733 +45 +4.5% 690 732 45 0
KM 16-17 733 755 +21 +2.1% 734 755 23 2
KM 17-18 755 765 +10 +1.0% 755 773 16 6
KM 18-19 765 789 +25 +2.5% 763 787 25 0
KM 19-20 789 813 +24 +2.4% 790 813 24 0
KM 20-21 813 800 -13 -1.3% 801 820 6 20
KM 21-22 800 788 -12 -1.2% 789 799 0 12
KM 22-23 788 800 +11 +1.1% 788 799 12 1
KM 23-24 800 775 -25 -2.5% 775 805 5 29
KM 24-25 775 765 -10 -1.0% 765 774 0 10
KM 25-26 765 763 -2 -0.2% 759 767 6 8
KM 26-27 763 765 +2 +0.2% 763 765 3 0
KM 27-28 765 751 -14 -1.4% 751 765 0 14
KM 28-29 751 748 -3 -0.3% 749 759 7 10
KM 29-30 748 755 +7 +0.7% 741 755 13 6
KM 30-31 755 759 +4 +0.4% 755 759 5 1
KM 31-32 759 750 -9 -0.9% 750 759 0 9
KM 32-33 750 777 +27 +2.7% 751 777 27 0
KM 33-34 777 782 +5 +0.5% 777 782 5 0
KM 34-35 782 794 +12 +1.2% 782 795 12 0
KM 35-36 794 757 -38 -3.8% 757 794 0 38
KM 36-37 757 742 -14 -1.4% 743 756 1 15
KM 37-38 742 722 -20 -2.0% 722 743 0 20
KM 38-39 722 723 +1 +0.1% 721 731 8 6
KM 39-40 723 706 -17 -1.7% 697 723 7 24
KM 40-41 706 750 +43 +4.3% 707 750 43 0
KM 41-42 750 791 +41 +4.1% 747 790 43 2
KM 42-43 791 766 -25 -2.5% 766 795 4 29
KM 43-44 766 697 -69 -6.9% 697 764 0 69
KM 44-45 697 656 -41 -4.1% 653 697 3 44
KM 45-46 656 701 +45 +4.5% 657 701 45 0
KM 46-47 701 718 +16 +1.6% 699 722 23 6
KM 47-48 718 757 +40 +4.0% 713 757 41 2
KM 48-49 757 747 -10 -1.0% 747 765 6 16
KM 49-50 747 739 -8 -0.8% 730 746 8 16
KM 50-51 739 765 +26 +2.6% 739 765 26 0
KM 51-52 765 744 -21 -2.1% 740 766 4 25
KM 52-53 744 765 +20 +2.0% 745 772 27 7
KM 53-54 765 706 -59 -5.9% 707 764 0 59
KM 54-55 706 660 -46 -4.6% 660 705 0 46
KM 55-56 660 700 +41 +4.1% 660 701 41 0
KM 56-57 700 688 -13 -1.3% 686 700 2 14
KM 57-58 688 670 -18 -1.8% 670 688 1 19
KM 58-59 670 650 -20 -2.0% 650 669 0 20
KM 59-60 650 619 -31 -3.1% 620 650 0 31
KM 60-61 619 607 -12 -1.2% 603 618 4 15
KM 61-62 607 571 -36 -3.6% 571 607 0 36
KM 62-63 571 560 -10 -1.0% 559 571 2 12
KM 63-64 560 554 -7 -0.7% 554 560 0 7
KM 64-65 554 546 -7 -0.7% 544 554 2 9
KM 65-66 546 511 -36 -3.6% 511 547 0 36
KM 66-67 511 441 -69 -6.9% 444 508 0 69
KM 67-68 441 389 -53 -5.3% 390 439 0 53
KM 68-69 389 357 -31 -3.1% 357 388 1 32
KM 69-70 357 351 -6 -0.6% 352 357 2 8
KM 70-71 351 337 -14 -1.4% 338 351 0 14
KM 71-72 337 331 -6 -0.6% 326 337 4 11
KM 72-73 331 376 +45 +4.5% 331 376 45 0
KM 73-74 376 325 -51 -5.1% 326 376 0 51
KM 74-75 325 286 -39 -3.9% 286 323 0 39
KM 75-76 286 277 -8 -0.8% 279 286 0 8
KM 76-77 277 273 -4 -0.4% 275 278 1 4
KM 77-78 273 230 -44 -4.4% 232 273 0 44
KM 78-79 230 195 -34 -3.4% 197 229 0 34
KM 79-80 195 158 -37 -3.7% 159 194 0 37
KM 80-81 158 135 -23 -2.3% 134 158 5 28
KM 81-82 135 165 +30 +3.0% 131 164 34 4
KM 82-83 165 127 -38 -3.8% 128 167 1 40
KM 83-84 127 84 -43 -4.3% 84 126 0 43
KM 84-85 84 90 +7 +0.7% 83 94 9 3
KM 85-86 90 55 -36 -3.6% 56 89 0 36
KM 86-87 55 14 -40 -4.0% 15 53 0 40
KM 87-88 14 15 0 0% 10 15 4 4
KM 88-89 15 10 -4 -0.4% 10 15 0 4
KM 89-90 10 11 +1 +0.1% 9 12 2 1
KM 90-90.92 11 9 -2 -0.2% 9 11 0 11

GNR-GAP index - Go&Race Algorithm Estimate

Based on the elevation profile analysis, running on this course is estimated to result in a pace that is 2.7% slower.

For example, a runner who maintains a pace of 5'00"/km (8'03"/mi) on a flat 90.9 km course, corresponding to a finish time of 7h34'34", is estimated to complete this course in 7h47'04". The recalculated average pace (GAP) improves to 5'08"/km (8'16"/mi), making it 0'08"/km (0'13"/mi) slower.


The following graph illustrates the Pace Adjustment (PA) factor applied to the pace along the course. The horizontal red line represents a PA of 1, meaning no pace adjustment. Above the line, the pace is slower; below the line, it is faster. The table below also provides estimates for other pace ranges.



Predict your race or analyze your performance!

This following table shows simulations for paces between 3 and 8 min/km.

RACE PREDICTION
To estimate a possible race time, use the "Pace" or "Time without slopes" column, which are valid for a flat course.
For example, if you think you can cover this distance on a flat course at a pace of 4'40"/km (or 7'31"/mi), i.e. in a time of 7h04'16", the estimate is to complete this course in 7h15'56", corresponding to a pace of 4'48"/km (or 7'43"/mi).

PERFORMANCE ANALYSIS
If you have run this race, use the table to estimate the equivalent time on a flat course. Check the "GAP" column and find the value closest to your pace, or compare the "Time with slopes" column with your time: on the same row you will find the pace and the equivalent time on a flat course in the "Pace" and "Time without slopes" columns.
For example, a time of 7h00'22" (pace of 4'37"/km or 7'26"/mi) corresponds to a time of 6h49'07" on a flat course (pace of 4'30"/km or 7'15"/mi).

Pace (min/km) Pace (min/mile) Time without slopes (hh:mm:ss) Time with slopes (hh:mm:ss) GAP (min/km) Δ Pace (min/km) GAP (min/mile) Δ Pace (min/mile)
3'00"4'50"4h32'44"4h40'14"3'05"0'05"4'58"0'08"
3'05"4'58"4h40'19"4h48'01"3'10"0'05"5'06"0'08"
3'10"5'06"4h47'54"4h55'49"3'15"0'05"5'14"0'08"
3'15"5'14"4h55'28"5h03'36"3'20"0'05"5'22"0'09"
3'20"5'22"5h03'03"5h11'23"3'25"0'05"5'31"0'09"
3'25"5'30"5h10'37"5h19'10"3'31"0'06"5'39"0'09"
3'30"5'38"5h18'12"5h26'57"3'36"0'06"5'47"0'09"
3'35"5'46"5h25'46"5h34'44"3'41"0'06"5'56"0'10"
3'40"5'54"5h33'21"5h42'31"3'46"0'06"6'04"0'10"
3'45"6'02"5h40'56"5h50'18"3'51"0'06"6'12"0'10"
3'50"6'10"5h48'30"5h58'05"3'56"0'06"6'20"0'10"
3'55"6'18"5h56'05"6h05'52"4'01"0'06"6'29"0'10"
4'00"6'26"6h03'39"6h13'39"4'07"0'07"6'37"0'11"
4'05"6'34"6h11'14"6h21'26"4'12"0'07"6'45"0'11"
4'10"6'42"6h18'48"6h29'14"4'17"0'07"6'53"0'11"
4'15"6'50"6h26'23"6h37'01"4'22"0'07"7'02"0'11"
4'20"6'58"6h33'58"6h44'48"4'27"0'07"7'10"0'12"
4'25"7'06"6h41'32"6h52'35"4'32"0'07"7'18"0'12"
4'30"7'15"6h49'07"7h00'22"4'37"0'07"7'26"0'12"
4'35"7'23"6h56'41"7h08'09"4'43"0'08"7'35"0'12"
4'40"7'31"7h04'16"7h15'56"4'48"0'08"7'43"0'12"
4'45"7'39"7h11'51"7h23'43"4'53"0'08"7'51"0'13"
4'50"7'47"7h19'25"7h31'30"4'58"0'08"8'00"0'13"
4'55"7'55"7h27'00"7h39'17"5'03"0'08"8'08"0'13"
5'00"8'03"7h34'34"7h47'04"5'08"0'08"8'16"0'13"
5'05"8'11"7h42'09"7h54'51"5'13"0'08"8'24"0'13"
5'10"8'19"7h49'43"8h02'38"5'19"0'09"8'33"0'14"
5'15"8'27"7h57'18"8h10'26"5'24"0'09"8'41"0'14"
5'20"8'35"8h04'53"8h18'13"5'29"0'09"8'49"0'14"
5'25"8'43"8h12'27"8h26'00"5'34"0'09"8'57"0'14"
5'30"8'51"8h20'02"8h33'47"5'39"0'09"9'06"0'15"
5'35"8'59"8h27'36"8h41'34"5'44"0'09"9'14"0'15"
5'40"9'07"8h35'11"8h49'21"5'49"0'09"9'22"0'15"
5'45"9'15"8h42'45"8h57'08"5'54"0'09"9'30"0'15"
5'50"9'23"8h50'20"9h04'55"6'00"0'10"9'39"0'15"
5'55"9'31"8h57'55"9h12'42"6'05"0'10"9'47"0'16"
6'00"9'39"9h05'29"9h20'29"6'10"0'10"9'55"0'16"
6'05"9'47"9h13'04"9h28'16"6'15"0'10"10'04"0'16"
6'10"9'55"9h20'38"9h36'03"6'20"0'10"10'12"0'16"
6'15"10'04"9h28'13"9h43'51"6'25"0'10"10'20"0'17"
6'20"10'12"9h35'48"9h51'38"6'30"0'10"10'28"0'17"
6'25"10'20"9h43'22"9h59'25"6'36"0'11"10'37"0'17"
6'30"10'28"9h50'57"10h07'12"6'41"0'11"10'45"0'17"
6'35"10'36"9h58'31"10h14'59"6'46"0'11"10'53"0'17"
6'40"10'44"10h06'06"10h22'46"6'51"0'11"11'01"0'18"
6'45"10'52"10h13'40"10h30'33"6'56"0'11"11'10"0'18"
6'50"11'00"10h21'15"10h38'20"7'01"0'11"11'18"0'18"
6'55"11'08"10h28'50"10h46'07"7'06"0'11"11'26"0'18"
7'00"11'16"10h36'24"10h53'54"7'12"0'12"11'35"0'19"
7'05"11'24"10h43'59"11h01'41"7'17"0'12"11'43"0'19"
7'10"11'32"10h51'33"11h09'28"7'22"0'12"11'51"0'19"
7'15"11'40"10h59'08"11h17'15"7'27"0'12"11'59"0'19"
7'20"11'48"11h06'43"11h25'03"7'32"0'12"12'08"0'19"
7'25"11'56"11h14'17"11h32'50"7'37"0'12"12'16"0'20"
7'30"12'04"11h21'52"11h40'37"7'42"0'12"12'24"0'20"
7'35"12'12"11h29'26"11h48'24"7'48"0'13"12'32"0'20"
7'40"12'20"11h37'01"11h56'11"7'53"0'13"12'41"0'20"
7'45"12'28"11h44'35"12h03'58"7'58"0'13"12'49"0'21"
7'50"12'36"11h52'10"12h11'45"8'03"0'13"12'57"0'21"
7'55"12'44"11h59'45"12h19'32"8'08"0'13"13'05"0'21"
8'00"12'52"12h07'19"12h27'19"8'13"0'13"13'14"0'21"

Notes on the calculation of the length, altimetry and slope

Note 1: the length of the route is calculated using the geographic coordinates. This value may differ slightly from the official length declared by the organizers.
Note 2: the altimetry may not correspond exactly to the real values. For routes obtained via Google API, it is possible that the altitude is that of the terrain, without considering tunnels or viaducts. If from GPS tracking, the error is arbitrary.
Note 3: the percentage slope is calculated on sections of at least 50 meters and smoothed. Roads with gradients between -3%% and +3%% are considered flat, between +3%% and +7%% are uphill, and greater than +7%% are considered steep.

🍺 A beer for the Team?