flag

3° Mezza sul Serio, 2014 course map and altimetry

3° Mezza sul Serio: 2014 route, altimetry, gpx

Note: "3° Mezza sul Serio" is NOT organized by goandrace.com

3° Mezza sul Serio course map. Lenght: 10 km (6.2 mi).

On this page is shown the 10 km (6.2 mi) course map of the event "3° Mezza sul Serio" in Fiorano al Serio, in the Province of Bergamo (Sunday, March 30, 2014). Explore the route!

Do you want to fly over the path with a Google Earth 3D video? Click on the following link: 3° Mezza sul Serio, fly over the path (3D video).

Download the gps race path by clicking here. You can send the .gpx file to your Garmin watch or other compatible device and follow the path. NB: it is possible that the length calculated from the gpx file is greater than that of the race, with an error typically of 1-2%, so for example a half-marathon could be 2-300 meters longer.

Click the following link to visit the 3° Mezza sul Serio event page.

Path statistics

3° Mezza sul Serio, interactive route

Here you can set the km (or mile) markers. You can start an animation by clicking on the button 'Animate'. On the map you can select different types of layers (by Google or Openstreetmap).

Click to start animation along the route

Notes

Note 1: the path length, here calculated using Google Map, may be different from that declared by the race organizers. Accept as true the latter.
Note 2: the elevation and slope are estimated again using Google and may differ from the real ones. Pay attention to any paths with tunnels or viaducts, because the altitude calculated by Google is not that of the road, but rather the land!
Note 3: the slope is found by calculating the change in altitude of at least 150 m (492 ft) long sections. Level roads: slopes between -3% and +3%. Uphill roads: slopes between +3% and +7%. Steep hill upwards: slopes greater than +7%. Similar classification for descents.

Km by km route altimetry analysis

Lap Start Alt. End Alt. Diff. Alt. Aver. Slope Min Alt. Max Alt. Tot Climb Tot Descent
KM 0-1 384 369 -15 -1.5% 365 384 5 21
KM 1-2 369 384 +15 +1.5% 363 383 21 5
KM 2-3 384 406 +22 +2.2% 384 406 22 0
KM 3-4 406 400 -6 -0.6% 399 427 19 25
KM 4-5 400 387 -13 -1.3% 387 400 2 15
KM 5-6 387 368 -18 -1.8% 365 387 1 20
KM 6-7 368 379 +11 +1.1% 363 378 16 5
KM 7-8 379 405 +27 +2.7% 380 405 28 1
KM 8-9 405 400 -6 -0.6% 398 428 23 29
KM 9-10 400 385 -14 -1.4% 387 399 2 16