flag

Mondseeland Halbmarathon 2023, course map and altimetry.

Mondseeland Halbmarathon 2023: map course, altimetry, gpx

Note: "Mondseeland Halbmarathon 2023" is NOT organized by goandrace.com

On this page is shown the 21.098 km (13.112 mi) course map of the event "Mondseeland Halbmarathon 2023" in Mondsee (Saturday, June 3, 2023). Explore the route!
Set on the map the km (or mile) markers. If you want, start an animation by clicking on the button 'Animate'. On the map you can also select different types of layers (Google Map and Open Street Map).

Do you want to fly over the path over the path with a Google Earth 3D animation? Click on the following link:
Mondseeland Halbmarathon 2023: fly over the path (3D animation)

Mondseeland Halbmarathon 2023 event page

Download the gps race path by clicking here. You can send the .gpx file to your Garmin watch or other compatible device and follow the path.

Unit and marker distance

  Click to start marker animation along the route.

Note 1: Note 1: the path length, here calculated using Google Map, may be different from that declared by the race organizers. Accept as true the latter.
Note 2: the elevation and slope are estimated again using Google and may differ from the real ones. Pay attention to any paths with tunnels or viaducts, because the altitude calculated by Google is not that of the road, but rather the land!
Note 3: the slope is found by calculating the change in altitude of at least 150 m (492 ft) long sections. Level roads: slopes between -3% and +3%. Uphill roads: slopes between +3% and +7%. Steep hill upwards: slopes greater than +7%. Similar classification for descents.


Km by km route altimetry analysis

Lap Start Alt. End Alt. Diff. Alt. Aver. Slope Min Alt. Max Alt. Tot Climb Tot Descent
KM 0-1 494 483 -11 -1.1% 483 494 0 11
KM 1-2 483 488 +5 +0.5% 482 492 14 8
KM 2-3 488 490 +2 +0.2% 487 490 4 2
KM 3-4 490 490 0 0% 490 497 6 6
KM 4-5 490 485 -5 -0.5% 482 489 4 9
KM 5-6 485 498 +13 +1.3% 486 503 18 4
KM 6-7 498 491 -8 -0.8% 486 498 6 14
KM 7-8 491 506 +16 +1.6% 491 506 16 0
KM 8-9 506 502 -4 -0.4% 502 507 0 4
KM 9-10 502 513 +11 +1.1% 503 513 11 0
KM 10-11 513 512 -2 -0.2% 509 514 4 6
KM 11-12 512 514 +2 +0.2% 512 514 2 1
KM 12-13 514 509 -5 -0.5% 509 514 4 9
KM 13-14 509 510 +2 +0.2% 505 510 5 3
KM 14-15 510 504 -6 -0.6% 504 510 0 6
KM 15-16 504 488 -16 -1.6% 482 504 5 21
KM 16-17 488 484 -4 -0.4% 482 493 4 7
KM 17-18 484 490 +6 +0.6% 486 498 13 7
KM 18-19 490 487 -3 -0.3% 488 493 2 5
KM 19-20 487 485 -3 -0.3% 482 492 10 12
KM 20-21 485 491 +6 +0.6% 482 490 8 2
KM 21-21.10 491 492 +1 +0.1% 491 492 1 0