flag

10° Montanaro Trail, course map and altimetry.

10° Montanaro Trail: map course, altimetry, gpx

Note: "10° Montanaro Trail" is NOT organized by goandrace.com

On this page is shown the 25 km (15.538 mi) course map of the event "10° Montanaro Trail" in San Marcello Pistoiese, in the Province of Pistoia (Sunday, September 17, 2023). Explore the route!
Set on the map the km (or mile) markers. If you want, start an animation by clicking on the button 'Animate'. On the map you can also select different types of layers (Google Map and Open Street Map).

Do you want to fly over the path over the path with a Google Earth 3D animation? Click on the following link:
10° Montanaro Trail: fly over the path (3D animation)

10° Montanaro Trail event page

Download the gpx file of the race path by clicking here. You can use it to send to your Garmin watch or other compatible device.

Unit and marker distance

  Click to start marker animation along the route.

Note 1: Note 1: the path length, here calculated using Google Map, may be different from that declared by the race organizers. Accept as true the latter.
Note 2: the elevation and slope are estimated again using Google and may differ from the real ones. Pay attention to any paths with tunnels or viaducts, because the altitude calculated by Google is not that of the road, but rather the land!
Note 3: the slope is found by calculating the change in altitude of at least 150 m (492 ft) long sections. Level roads: slopes between -3% and +3%. Uphill roads: slopes between +3% and +7%. Steep hill upwards: slopes greater than +7%. Similar classification for descents.


Km by km route altimetry analysis

Lap Start Alt. End Alt. Diff. Alt. Aver. Slope Min Alt. Max Alt. Tot Climb Tot Descent
KM 0-1 625 699 +74 +7.4% 625 698 74 0
KM 1-2 699 826 +128 +12.8% 699 826 128 0
KM 2-3 826 969 +142 +14.2% 838 968 142 0
KM 3-4 969 1168 +199 +19.9% 965 1168 199 0
KM 4-5 1168 1353 +185 +18.5% 1168 1348 185 0
KM 5-6 1353 1438 +85 +8.5% 1366 1446 92 7
KM 6-7 1438 1448 +10 +1.0% 1436 1449 15 5
KM 7-8 1448 1576 +128 +12.8% 1436 1581 142 14
KM 8-9 1576 1658 +82 +8.2% 1575 1657 82 0
KM 9-10 1658 1782 +124 +12.4% 1659 1803 145 21
KM 10-11 1782 1664 -118 -11.8% 1663 1782 0 118
KM 11-12 1664 1641 -23 -2.3% 1603 1664 37 60
KM 12-13 1641 1563 -77 -7.7% 1561 1653 13 90
KM 13-14 1563 1408 -155 -15.5% 1411 1580 15 170
KM 14-15 1408 1147 -261 -26.1% 1148 1396 0 261
KM 15-16 1147 1044 -103 -10.3% 1044 1147 0 103
KM 16-17 1044 1075 +31 +3.1% 1038 1074 35 4
KM 17-18 1075 1135 +60 +6.0% 1078 1137 62 2
KM 18-19 1135 1121 -13 -1.3% 1115 1134 9 23
KM 19-20 1121 1100 -21 -2.1% 1102 1125 3 24
KM 20-21 1100 1020 -81 -8.1% 1020 1099 0 81
KM 21-22 1020 893 -127 -12.7% 891 1015 2 129
KM 22-23 893 815 -78 -7.8% 817 894 0 78
KM 23-24 815 678 -137 -13.7% 680 812 0 137
KM 24-25 678 625 -53 -5.3% 617 675 5 58