flag

Canossa Trail Marathon 2023 | Course | Altimetry

Canossa Trail Marathon 2023: route, altitude, uphill/downhill statistics, gpx file

Note: "Canossa Trail Marathon 2023" is NOT organized by goandrace.com

Canossa Trail Marathon 2023 course map. Lenght: 24 km (14.9 mi).

24 km (14.9 mi) course map of the event "Canossa Trail Marathon 2023" in Vezzano sul Crostolo, in the Province of Reggio nell'Emilia (Sunday, October 15, 2023). Explore the route!

Do you want to fly over the path with a Google Earth 3D video? Click on the following link: Canossa Trail Marathon 2023, fly over the path (3D video).

GPS track - .gpx file download

Download the gps race path by clicking here. You can send the .gpx file to your Garmin watch or other compatible device and follow the path. For instructions on how to upload the GPX file onto your Garmin watch click here.

 .gpx file download

NB: it is possible that the length calculated from the gpx file is greater than that of the race, with an error typically of 1-2%, so for example a half-marathon could be 2-300 meters longer.

Click the following link to visit the Canossa Trail Marathon 2023 event page.

Canossa Trail Marathon 2023: route altimetric information


Canossa Trail Marathon 2023: GNR-GAP index (v 1.0, experimental, see more)

Canossa Trail Marathon 2023: interactive route

You can set the km (or mile) markers and you can select different types of layers (Satellite or Openstreetmap).

Canossa Trail Marathon 2023: altimetry graph

Canossa Trail Marathon 2023: slope graph

Canossa Trail Marathon 2023: percentage distribution of slope

Canossa Trail Marathon 2023: Km by km route altimetry analysis

Lap Start Alt. End Alt. Diff. Alt. Aver. Slope Min Alt. Max Alt. Tot Climb Tot Descent
KM 0-1 155 270 +115 +11.5% 152 270 115 0
KM 1-2 270 359 +89 +8.9% 270 359 89 0
KM 2-3 359 409 +50 +5.0% 359 423 63 13
KM 3-4 409 350 -59 -5.9% 343 410 19 78
KM 4-5 350 328 -22 -2.2% 322 373 32 54
KM 5-6 328 332 +4 +0.4% 322 353 36 32
KM 6-7 332 385 +53 +5.3% 332 392 57 4
KM 7-8 385 444 +59 +5.9% 369 444 83 24
KM 8-9 444 392 -52 -5.2% 392 494 48 100
KM 9-10 392 289 -102 -10.2% 286 391 3 106
KM 10-11 289 330 +41 +4.1% 290 330 41 0
KM 11-12 330 426 +96 +9.6% 330 426 96 0
KM 12-13 426 520 +94 +9.4% 426 520 94 0
KM 13-14 520 497 -23 -2.3% 495 527 8 31
KM 14-15 497 485 -12 -1.2% 485 507 12 24
KM 15-16 485 507 +22 +2.2% 432 506 73 51
KM 16-17 507 479 -28 -2.8% 466 536 40 68
KM 17-18 479 375 -104 -10.4% 375 488 0 104
KM 18-19 375 311 -64 -6.4% 311 374 0 64
KM 19-20 311 257 -54 -5.4% 220 311 36 90
KM 20-21 257 407 +150 +15.0% 257 407 150 0
KM 21-22 407 356 -51 -5.1% 356 426 16 67
KM 22-23 356 264 -92 -9.2% 264 355 8 100
KM 23-23.85 264 168 -96 -9.6% 168 264 0 18058