flag

Canossa Trail Marathon 2023, course map and altimetry.

Canossa Trail Marathon 2023: map course, altimetry, gpx

Note: "Canossa Trail Marathon 2023" is NOT organized by goandrace.com

On this page is shown the 24 km (14.916 mi) course map of the event "Canossa Trail Marathon 2023" in Vezzano sul Crostolo, in the Province of Reggio nell'Emilia (Sunday, October 15, 2023). Explore the route!
Set on the map the km (or mile) markers. If you want, start an animation by clicking on the button 'Animate'. On the map you can also select different types of layers (Google Map and Open Street Map).

Do you want to fly over the path over the path with a Google Earth 3D animation? Click on the following link:
Canossa Trail Marathon 2023: fly over the path (3D animation)

Canossa Trail Marathon 2023 event page

Download the gps race path by clicking here. You can send the .gpx file to your Garmin watch or other compatible device and follow the path.

Unit and marker distance

  Click to start marker animation along the route.

Note 1: Note 1: the path length, here calculated using Google Map, may be different from that declared by the race organizers. Accept as true the latter.
Note 2: the elevation and slope are estimated again using Google and may differ from the real ones. Pay attention to any paths with tunnels or viaducts, because the altitude calculated by Google is not that of the road, but rather the land!
Note 3: the slope is found by calculating the change in altitude of at least 150 m (492 ft) long sections. Level roads: slopes between -3% and +3%. Uphill roads: slopes between +3% and +7%. Steep hill upwards: slopes greater than +7%. Similar classification for descents.


Km by km route altimetry analysis

Lap Start Alt. End Alt. Diff. Alt. Aver. Slope Min Alt. Max Alt. Tot Climb Tot Descent
KM 0-1 155 270 +115 +11.5% 152 270 115 0
KM 1-2 270 359 +89 +8.9% 270 359 89 0
KM 2-3 359 409 +50 +5.0% 359 423 63 13
KM 3-4 409 350 -59 -5.9% 343 410 19 78
KM 4-5 350 328 -22 -2.2% 322 373 32 54
KM 5-6 328 332 +4 +0.4% 322 353 36 32
KM 6-7 332 385 +53 +5.3% 332 392 57 4
KM 7-8 385 444 +59 +5.9% 369 444 83 24
KM 8-9 444 392 -52 -5.2% 392 494 48 100
KM 9-10 392 289 -102 -10.2% 286 391 3 106
KM 10-11 289 330 +41 +4.1% 290 330 41 0
KM 11-12 330 426 +96 +9.6% 330 426 96 0
KM 12-13 426 520 +94 +9.4% 426 520 94 0
KM 13-14 520 497 -23 -2.3% 495 527 8 31
KM 14-15 497 485 -12 -1.2% 485 507 12 24
KM 15-16 485 507 +22 +2.2% 432 506 73 51
KM 16-17 507 479 -28 -2.8% 466 536 40 68
KM 17-18 479 375 -104 -10.4% 375 488 0 104
KM 18-19 375 311 -64 -6.4% 311 374 0 64
KM 19-20 311 257 -54 -5.4% 220 311 36 90
KM 20-21 257 407 +150 +15.0% 257 407 150 0
KM 21-22 407 356 -51 -5.1% 356 426 16 67
KM 22-23 356 264 -92 -9.2% 264 355 8 100
KM 23-23.85 264 168 -96 -9.6% 168 264 0 18058