flag

9° Trail del Marchesato, 2024 course map and altimetry

9° Trail del Marchesato: 2024 route, altimetry, gpx

Note: "9° Trail del Marchesato" is NOT organized by goandrace.com

9° Trail del Marchesato course map. Lenght: 38 km (23.6 mi).

On this page is shown the 38 km (23.6 mi) course map of the event "9° Trail del Marchesato" in Finalborgo, in the Province of Savona (Sunday, March 3, 2024). Explore the route!

Do you want to fly over the path with a Google Earth 3D video? Click on the following link: 9° Trail del Marchesato, fly over the path (3D video).

Download the gps race path by clicking here. You can send the .gpx file to your Garmin watch or other compatible device and follow the path. NB: it is possible that the length calculated from the gpx file is greater than that of the race, with an error typically of 1-2%, so for example a half-marathon could be 2-300 meters longer.

Click the following link to visit the 9° Trail del Marchesato event page.

Path statistics

9° Trail del Marchesato, interactive route

Here you can set the km (or mile) markers. You can start an animation by clicking on the button 'Animate'. On the map you can select different types of layers (by Google or Openstreetmap).

Click to start animation along the route

Notes

Note 1: the path length, here calculated using Google Map, may be different from that declared by the race organizers. Accept as true the latter.
Note 2: the elevation and slope are estimated again using Google and may differ from the real ones. Pay attention to any paths with tunnels or viaducts, because the altitude calculated by Google is not that of the road, but rather the land!
Note 3: the slope is found by calculating the change in altitude of at least 150 m (492 ft) long sections. Level roads: slopes between -3% and +3%. Uphill roads: slopes between +3% and +7%. Steep hill upwards: slopes greater than +7%. Similar classification for descents.

Km by km route altimetry analysis

Lap Start Alt. End Alt. Diff. Alt. Aver. Slope Min Alt. Max Alt. Tot Climb Tot Descent
KM 0.0137-1 52 146 +94 +9.4% 52 154 104 10
KM 1-2 146 149 +3 +0.3% 113 157 36 33
KM 2-3 149 316 +167 +16.7% 146 316 167 0
KM 3-4 316 283 -33 -3.3% 270 341 58 91
KM 4-5 283 366 +83 +8.3% 283 366 86 3
KM 5-6 366 275 -91 -9.1% 275 369 0 91
KM 6-7 275 131 -144 -14.4% 131 275 0 144
KM 7-8 131 288 +157 +15.7% 96 287 185 28
KM 8-9 288 327 +39 +3.9% 291 334 44 5
KM 9-10 327 259 -68 -6.8% 259 327 0 68
KM 10-11 259 186 -73 -7.3% 188 259 8 81
KM 11-12 186 118 -68 -6.8% 118 179 0 68
KM 12-13 118 88 -30 -3.0% 24 118 59 89
KM 13-14 88 123 +35 +3.5% 90 145 51 16
KM 14-15 123 282 +159 +15.9% 123 282 159 0
KM 15-16 282 311 +29 +2.9% 269 309 53 24
KM 16-17 311 318 +7 +0.7% 312 329 25 18
KM 17-18 318 261 -57 -5.7% 258 317 3 60
KM 18-19 261 146 -115 -11.5% 141 261 1 116
KM 19-20 146 268 +122 +12.2% 146 270 122 0
KM 20-21 268 288 +20 +2.0% 266 330 75 55
KM 21-22 288 359 +71 +7.1% 288 374 86 15
KM 22-23 359 389 +30 +3.0% 355 389 40 10
KM 23-24 389 333 -56 -5.6% 333 393 8 64
KM 24-25 333 262 -71 -7.1% 264 334 1 72
KM 25-26 262 188 -74 -7.4% 188 261 0 74
KM 26-27 188 185 -3 -0.3% 138 188 43 46
KM 27-28 185 340 +155 +15.5% 185 338 155 0
KM 28-29 340 379 +39 +3.9% 341 378 49 10
KM 29-30 379 361 -18 -1.8% 361 388 12 30
KM 30-31 361 232 -129 -12.9% 232 361 0 129
KM 31-32 232 325 +93 +9.3% 225 359 125 32
KM 32-33 325 276 -49 -4.9% 276 355 32 81
KM 33-34 276 145 -131 -13.1% 145 276 0 131
KM 34-35 145 317 +172 +17.2% 145 317 177 5
KM 35-36 317 221 -96 -9.6% 221 337 25 121
KM 36-37 221 166 -55 -5.5% 147 223 13 68
KM 37-38 166 68 -98 -9.8% 68 166 25 123
KM 38-38.15 68 56 -12 -1.2% 56 65 0 56