flag

Beneva Mississauga Marathon, 2024 course map and altimetry

Beneva Mississauga Marathon: 2024 route, altimetry, gpx

Note: "Beneva Mississauga Marathon" is NOT organized by goandrace.com

Beneva Mississauga Marathon course map. Lenght: 42.195 km (26.2 mi).

On this page is shown the 42.195 km (26.2 mi) course map of the event "Beneva Mississauga Marathon" in Mississauga (Sunday, April 28, 2024). Explore the route!

Do you want to fly over the path with a Google Earth 3D video? Click on the following link: Beneva Mississauga Marathon, fly over the path (3D video).

Download the gps race path by clicking here. You can send the .gpx file to your Garmin watch or other compatible device and follow the path. NB: it is possible that the length calculated from the gpx file is greater than that of the race, with an error typically of 1-2%, so for example a half-marathon could be 2-300 meters longer.

Click the following link to visit the Beneva Mississauga Marathon event page.

Path statistics

Beneva Mississauga Marathon, interactive route

Here you can set the km (or mile) markers. You can start an animation by clicking on the button 'Animate'. On the map you can select different types of layers (by Google or Openstreetmap).

Click to start animation along the route

Notes

Note 1: the path length, here calculated using Google Map, may be different from that declared by the race organizers. Accept as true the latter.
Note 2: the elevation and slope are estimated again using Google and may differ from the real ones. Pay attention to any paths with tunnels or viaducts, because the altitude calculated by Google is not that of the road, but rather the land!
Note 3: the slope is found by calculating the change in altitude of at least 150 m (492 ft) long sections. Level roads: slopes between -3% and +3%. Uphill roads: slopes between +3% and +7%. Steep hill upwards: slopes greater than +7%. Similar classification for descents.

Km by km route altimetry analysis

Lap Start Alt. End Alt. Diff. Alt. Aver. Slope Min Alt. Max Alt. Tot Climb Tot Descent
KM 0-1 157 143 -14 -1.4% 143 157 0 14
KM 1-2 143 157 +13 +1.3% 144 155 13 0
KM 2-3 157 160 +3 +0.3% 157 161 4 1
KM 3-4 160 156 -4 -0.4% 159 163 3 7
KM 4-5 156 159 +3 +0.3% 155 159 3 0
KM 5-6 159 161 +2 +0.2% 156 161 4 2
KM 6-7 161 145 -16 -1.6% 147 157 0 16
KM 7-8 145 138 -7 -0.7% 114 139 24 31
KM 8-9 138 136 -2 -0.2% 136 140 1 3
KM 9-10 136 129 -7 -0.7% 131 138 1 8
KM 10-11 129 110 -19 -1.9% 109 129 2 21
KM 11-12 110 103 -7 -0.7% 103 112 2 9
KM 12-13 103 120 +17 +1.7% 98 121 22 5
KM 13-14 120 111 -9 -0.9% 111 120 0 9
KM 14-15 111 106 -5 -0.5% 106 111 0 5
KM 15-16 106 101 -5 -0.5% 101 105 1 6
KM 16-17 101 94 -7 -0.7% 96 102 2 9
KM 17-18 94 97 +2 +0.2% 92 95 6 3
KM 18-19 97 97 +1 +0.1% 90 98 10 10
KM 19-20 97 104 +7 +0.7% 99 104 7 0
KM 20-21 104 109 +5 +0.5% 105 109 6 1
KM 21-22 109 104 -6 -0.6% 104 110 1 6
KM 22-23 104 100 -4 -0.4% 99 103 1 5
KM 23-24 100 98 -2 -0.2% 97 102 1 3
KM 24-25 98 93 -4 -0.4% 95 98 0 5
KM 25-26 93 85 -9 -0.9% 86 92 0 9
KM 26-27 85 80 -5 -0.5% 80 86 2 7
KM 27-28 80 83 +3 +0.3% 78 84 7 4
KM 28-29 83 88 +5 +0.5% 82 85 6 1
KM 29-30 88 95 +6 +0.6% 90 95 7 0
KM 30-31 95 91 -4 -0.4% 89 109 19 23
KM 31-32 91 99 +8 +0.8% 86 96 16 8
KM 32-33 99 96 -3 -0.3% 86 99 10 13
KM 33-34 96 90 -7 -0.7% 85 95 7 14
KM 34-35 90 83 -6 -0.6% 80 88 4 10
KM 35-36 83 81 -2 -0.2% 78 88 4 6
KM 36-37 81 77 -4 -0.4% 77 83 4 8
KM 37-38 77 79 +2 +0.2% 75 80 4 2
KM 38-39 79 80 +1 +0.1% 78 80 2 1
KM 39-40 80 81 +1 +0.1% 80 83 3 2
KM 40-41 81 80 -1 -0.1% 77 83 5 6
KM 41-42 80 79 -2 -0.2% 76 81 3 5
KM 42-42.20 79 78 -1 -0.1% 78 81 8 3