flag

2024 Jerusalem Marathon, course map and altimetry

2024 Jerusalem Marathon: route, altimetry, gpx

Note: "2024 Jerusalem Marathon" is NOT organized by goandrace.com

2024 Jerusalem Marathon course map. Lenght: 42.195 km (26.2 mi).

On this page is shown the 42.195 km (26.2 mi) course map of the event "2024 Jerusalem Marathon" in Jerusalem (Friday, March 8, 2024). Explore the route!

Do you want to fly over the path with a Google Earth 3D video? Click on the following link: 2024 Jerusalem Marathon, fly over the path (3D video).

Download the gps race path by clicking here. You can send the .gpx file to your Garmin watch or other compatible device and follow the path. NB: it is possible that the length calculated from the gpx file is greater than that of the race, with an error typically of 1-2%, so for example a half-marathon could be 2-300 meters longer.

Click the following link to visit the 2024 Jerusalem Marathon event page.

Path statistics

2024 Jerusalem Marathon, interactive route

Here you can set the km (or mile) markers. You can start an animation by clicking on the button 'Animate'. On the map you can select different types of layers (by Google or Openstreetmap).

Click to start animation along the route

Notes

Note 1: the path length, here calculated using Google Map, may be different from that declared by the race organizers. Accept as true the latter.
Note 2: the elevation and slope are estimated again using Google and may differ from the real ones. Pay attention to any paths with tunnels or viaducts, because the altitude calculated by Google is not that of the road, but rather the land!
Note 3: the slope is found by calculating the change in altitude of at least 150 m (492 ft) long sections. Level roads: slopes between -3% and +3%. Uphill roads: slopes between +3% and +7%. Steep hill upwards: slopes greater than +7%. Similar classification for descents.

Km by km route altimetry analysis

Lap Start Alt. End Alt. Diff. Alt. Aver. Slope Min Alt. Max Alt. Tot Climb Tot Descent
KM 0-1 778 776 -2 -0.2% 777 782 5 7
KM 1-2 776 764 -12 -1.2% 761 775 1 13
KM 2-3 764 774 +10 +1.0% 757 774 17 7
KM 3-4 774 802 +28 +2.8% 771 802 29 1
KM 4-5 802 783 -19 -1.9% 785 809 7 26
KM 5-6 783 772 -11 -1.1% 773 782 3 14
KM 6-7 772 754 -18 -1.8% 749 769 4 22
KM 7-8 754 773 +19 +1.9% 755 773 21 2
KM 8-9 773 792 +20 +2.0% 770 797 24 5
KM 9-10 792 797 +5 +0.5% 771 796 26 21
KM 10-11 797 807 +10 +1.0% 798 808 11 1
KM 11-12 807 794 -13 -1.3% 795 810 3 16
KM 12-13 794 778 -16 -1.6% 777 791 6 22
KM 13-14 778 777 0 0% 761 780 21 22
KM 14-15 777 769 -8 -0.8% 764 790 11 19
KM 15-16 769 766 -4 -0.4% 768 780 11 14
KM 16-17 766 780 +14 +1.4% 755 779 23 9
KM 17-18 780 793 +13 +1.3% 782 804 19 6
KM 18-19 793 809 +16 +1.6% 773 814 54 38
KM 19-20 809 804 -5 -0.5% 803 813 8 13
KM 20-21 804 786 -18 -1.8% 791 803 8 26
KM 21-22 786 768 -18 -1.8% 769 785 0 18
KM 22-23 768 766 -2 -0.2% 754 763 12 14
KM 23-24 766 769 +3 +0.3% 770 779 13 10
KM 24-25 769 777 +8 +0.8% 762 791 32 24
KM 25-26 777 749 -28 -2.8% 733 780 13 41
KM 26-27 749 785 +36 +3.6% 750 797 48 12
KM 27-28 785 740 -45 -4.5% 740 781 2 47
KM 28-29 740 748 +8 +0.8% 734 747 11 3
KM 29-30 748 756 +8 +0.8% 748 755 8 0
KM 30-31 756 761 +5 +0.5% 755 763 7 2
KM 31-32 761 780 +19 +1.9% 761 779 19 0
KM 32-33 780 783 +3 +0.3% 777 783 6 3
KM 33-34 783 772 -11 -1.1% 765 782 4 15
KM 34-35 772 767 -5 -0.5% 768 773 1 6
KM 35-36 767 767 0 0% 767 767 0 0
KM 36-37 767 770 +3 +0.3% 767 770 3 0
KM 37-38 770 751 -19 -1.9% 754 772 1 20
KM 38-39 751 762 +11 +1.1% 732 760 28 17
KM 39-40 762 753 -9 -0.9% 756 773 10 19
KM 40-41 753 733 -20 -2.0% 727 755 6 26
KM 41-42 733 756 +24 +2.4% 733 753 24 0
KM 42-42.20 756 766 +10 +1.0% 758 766 17 0