flag

Maratón de La Paz, 2024 course map and altimetry

Maratón de La Paz: 2024 route, altimetry, gpx

Note: "Maratón de La Paz" is NOT organized by goandrace.com

Maratón de La Paz course map. Lenght: 21.098 km (13.1 mi).

On this page is shown the 21.098 km (13.1 mi) course map of the event "Maratón de La Paz" in La Paz (Sunday, March 10, 2024). Explore the route!

Do you want to fly over the path with a Google Earth 3D video? Click on the following link: Maratón de La Paz, fly over the path (3D video).

Download the gps race path by clicking here. You can send the .gpx file to your Garmin watch or other compatible device and follow the path. NB: it is possible that the length calculated from the gpx file is greater than that of the race, with an error typically of 1-2%, so for example a half-marathon could be 2-300 meters longer.

Click the following link to visit the Maratón de La Paz event page.

Path statistics

Maratón de La Paz, interactive route

Here you can set the km (or mile) markers. You can start an animation by clicking on the button 'Animate'. On the map you can select different types of layers (by Google or Openstreetmap).

Click to start animation along the route

Notes

Note 1: the path length, here calculated using Google Map, may be different from that declared by the race organizers. Accept as true the latter.
Note 2: the elevation and slope are estimated again using Google and may differ from the real ones. Pay attention to any paths with tunnels or viaducts, because the altitude calculated by Google is not that of the road, but rather the land!
Note 3: the slope is found by calculating the change in altitude of at least 150 m (492 ft) long sections. Level roads: slopes between -3% and +3%. Uphill roads: slopes between +3% and +7%. Steep hill upwards: slopes greater than +7%. Similar classification for descents.

Km by km route altimetry analysis

Lap Start Alt. End Alt. Diff. Alt. Aver. Slope Min Alt. Max Alt. Tot Climb Tot Descent
KM 0.0627-1 3859 3813 -46 -4.6% 3816 3863 1 47
KM 1-2 3813 3758 -56 -5.6% 3760 3808 0 56
KM 2-3 3758 3723 -34 -3.4% 3716 3767 5 40
KM 3-4 3723 3712 -11 -1.1% 3713 3758 31 42
KM 4-5 3712 3626 -86 -8.6% 3627 3707 0 86
KM 5-6 3626 3581 -46 -4.6% 3581 3621 0 46
KM 6-7 3581 3586 +5 +0.5% 3559 3591 26 21
KM 7-8 3586 3512 -74 -7.4% 3513 3588 0 74
KM 8-9 3512 3514 +2 +0.2% 3456 3514 58 56
KM 9-10 3514 3473 -41 -4.1% 3484 3524 13 54
KM 10-11 3473 3423 -50 -5.0% 3425 3473 5 55
KM 11-12 3423 3360 -63 -6.3% 3360 3423 0 63
KM 12-13 3360 3317 -43 -4.3% 3317 3360 1 44
KM 13-14 3317 3279 -38 -3.8% 3280 3323 6 44
KM 14-15 3279 3243 -36 -3.6% 3245 3279 0 36
KM 15-16 3243 3228 -15 -1.5% 3228 3243 0 15
KM 16-17 3228 3208 -20 -2.0% 3209 3233 1 21
KM 17-18 3208 3244 +36 +3.6% 3208 3265 64 28
KM 18-19 3244 3313 +68 +6.8% 3245 3311 94 26
KM 19-19.66 3313 3277 -36 -3.6% 3277 3317 19 98